Doin’s and goin’s on’s

I DID get the Robot quilt finished in time!!!  I spent 3 hours and 10 minutes of the 3 1/2 hour trip whip stitching binding to the back.  I didn’t get a completed photo though.

Today I finished the label for the back.  ; )  I will stitch it in place when the family comes down for a visit…soon…!

Rocco Robot label

However, Momma Barb’s block was NOT completed and still isn’t, but I’m getting there.  Those little pine trees are buggers!

Jingle Bear block

Last week Scott rented an auger.  We had 11 post holes that needed dug to 36 inches depth.  Doing that by hand (and back) was not possible.  So a GroundHog auger came in right handy.  Next will be gravel and cementing poles/posts into place.  When the weather permits.

Diggity Dig

This past weekend saw a bit of electrical work getting done in the bathrooms.  And, a breaker went bad.  Scott replaced the breaker  and a switch in the master bathroom, and he made/installed a new outlet in the hall bath for Shelby’s automatic cat feeder.  He IS my Mr. Incredible!!!  ❤

Today it’s a “Wintry” mix of snow, sleet and freezing rain.  Good thing for a BIG pot of chicken soup with kale and homemade noodles!!!

Stay tucked in and take some stitches!

Piecefully, Pam

P.S. Did anyone get to the AQS Quilt Show in Lancaster?  How was it?!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s